BurstNET® Facility Info

BurstNET® has data centers and network points-of-presence (POPs) in the United States and Europe, and is constantly expanding our reach. The BurstNET® network utilizes routing and switching products from Cisco Systems® at all layers of the network.

Regional Websites  

BurstNET® PA Data Center 2 - Scranton/Dunmore

1205 O'Neill Highway, Dunmore, PA 18512

DOWNLOAD: WEB BROCHURE (PDF 400K) - PRINT BROCHURE (PDF 4.5MB)

Flagship Facility

The new BurstNET® flagship facility, housing our corporate global headquarters, recently opened to clientele in March 2013. BurstNET® has already relocated its corporate offices to the new facility as of August 2012. The 32,000 sq ft facility, with 50,000+ of expansion space available, will be a Tier II buildout, with sectional Tier III capability available as needed. The facility will be SSAE16/SOC70 compliant, with a heavy focus on Co-Location purposing, including heathcare, financial, and government clientele---the first major facility of its kind in Northeastern Pennsylvania.

BurstNET® will have it's own DWDM fiber optic network (1G, 10G, 40G, & 100G multi-circuit capable), running over leased dark fiber, directly connected to major New York City and New Jersey carrier hotels, followed later in 2013 by the same to Philadelphia PA. This will enable BurstNET® to compete directly with major US Colocation facilities, offering similar bandwidth options/pricing to major metros, all whilst operating in the less expensive Scranton PA region...and passing those savings on to our clientele. BurstNET® clientele will have access to all the major NYC carriers for example, including peering exchanges like NYIIX, all over BurstNET's® own transport system at nil to minimal cost. 10G lit transport circuits will also be active to New York City, Philadelphia, and Chicago.

Facility Specifications / Overview

  • BUILDING
    Two stories
    155,000 square feet
    Concrete, brick, and steel
    Outside 100 year flood plain
    Seismic zone 0
    Rubber membrane roof
  • UTILITY POWER
    Source: PPL Electric 12.4KV
    Facility: (2) 4000A/4MW 480V
    Upgrade: 8000A/8MW 480V
    Building: Shared 4000A/4MW 480V
  • BACKUP POWER
    1610KVA UPS protected power
    Gensets: (1) 1.5MW and (2) 750KW
    Pending: (1) 1MW and (1) 2MW
    Fuel: Diesel
  • COOLING
    1350 tons capacity
    (3) 450-ton chillers/towers
    Additional 450 tons install ready
    Hot/Cold aisle design
    Raised floor design
    Building-wide chilled water loop
  • FIBER & BUILDING ENTRY
    Diverse conduit entry points
    Diverse exterior conduit pathways beyond property
    Multiple fiber carriers
  • FIBER/TRANSPORT PROVIDERS
    Level3
    Verizon
    Zayo / AboveNet
    First Communications
    Comcast
    BurstNET (PA/NYC/NJ)
    Sunesys (pending)
  • IP/TRANSIT PROVIDERS (on-site)
    Level3
    Verizon
    Zayo / AboveNet
    Comcast
    BurstNET
  • IP/TRANSIT PROVIDERS (on-net)
    All @ 111 8th Avenue (NYC)
    All @ 401 N. Broad Street (PHL)
    All @ 165 Halsey Street (NJ) (pending)
    All @ 350 E. Cermak Road (CHI) (pending)

Colocation Service Highlights

  • Power

    Density, redundancy, & reliablility

  • Cooling

    Efficient, reliable, & robust capacity

  • Standards

    Compliance & audit requirements

  • Cages & Suites

    Custom designed configurations

Featured News
BurstNET® Releases New Website!
Thursday, March 16, 2013 - 03:13

New! BurstNET® Ultra SSD VPS Series!
Saturday, January 26, 2013 - 22:58

BurstNET® Dedicated Hosting in Miami, FL!
Wednesday, January 23, 2013 - 23:29

Dave S.

"By the way, your support staff is awesome. I had two minor issues on a client's VPS and they nailed them immediately."